Ügyfélszolgálat: Kattintson ideE-mail: info@maxfire.hu
The 54/2014. (XII.5.) BM Decree, the National Fire Protection Regulations (OTSZ) provide for the rules for the maintenance and operation of heat and smoke exhaust systems.According to the legislation, the so-called it is necessary to keep an operation and maintenance log. The maintenance log was prepared based on the legislation.
The operator's inspection of the heat and smoke protection solutions for the smoke removal and air replacement structure is due every 3 months, the review and maintenance every 6 months, i.e. every six months. these operations must be recorded in the fire protection operation log.
In the event of a shortage of stock, production is continuous and service is carried out in the order of received orders. Typical production time is 2-3 weeks.
Content and composition of the log:
The diary spine-reinforced version, stapled.
All >> at our fire protection exam << can be purchased on site.
88. § * (1) Heat and smoke extraction and the required amount of air replacement must be provideda) in a room with a floor area of more than 1,200 m2,b) in a room intended for mass stay,c ) on an escape route, with the exception of the smoke-free stairwell, the smoke-free vestibule and the fire-proof vestibule,d) in basement rooms with a floor area of more than 100 m2,e) in covered atriums,f) where the on the basis of purpose, this decree stipulates,g) in the case of a special building, XII. Based on chapter andh) where, based on the purpose and characteristics of smoke development, the fire protection authority
prescribes it in order to ensure the conditions for evacuation and fire fighting intervention. strong>
The diary is protected by copyright. Any duplication or copying is PROHIBITED and will result in legal action.
Did you know that you can now also buy heat and smoke exhaust (HF, RWA, TGA) components from us? You can buy CO2 propellant bottles, ampoules, Druckgasgenerators.
Click on the picture and buy at a discounted price.